July-September 2014
Project duration: 12weeks

Loft:

Our clients loft was cold in the winter, hot in the summer and in need of a refurbishment.

We came up with a solution using the latest insulation products to create a warm, dry and spacious room. The project included completely stripping out back to timbers and re-insulating. We insulated between and then below the roof rafters and ceiling joists, installed new Velux windows, re-wiried the electrical circuits, installed new radiators, re-plastered and finished the entire loft room, installing a pocket door to save space fitting in a spacious en-suite.

1st Floor:

We partly remodelled the 1st floor by moving two internal walls and installing a pocket door to save space, we were able to fit in a spacious main bathroom and a double bedroom. We insulated the external walls and re-plastered, we matched the existing joinery details on skirting boards, picture rails and architraves and part installed a new central heating system.